Entegrus requires a four-hour town-wide planned power outage that will affect the Bothwell later this month.
The target date is Nov. 19, a Saturday, from 6 a.m. to 10 a.m.
The shutdown is to allow crews to replace aging equipment and install upgrades at the Bothwell distribution station, according to Entegrus officials.
If the weather does not co-operate, the work will be rescheduled to Nov. 26, also from 6 a.m. to 10 a.m.